Saturday, November 5

November 5, 2011

Second floor done. Roof on house.  Wrap around porch almost done. The Trex decking for the porch is on site and should be installed Monday.   I have a lot of work do now as the winter storm dropped numerous trees across the driveway and all around the property.  Good thing I cleared enough land so nothing even came close to the house construction!
















Monday, October 24


Second floor walls going up.  Also the basement floor got poured and the garage floor got poured!













Sunday, October 23

Framing!!

A lot happening.  Framing started about a week and a half ago. First floor completed, second floor begun, and garage walls up!  Porch piers in place, so I hope that will be coming soon.  Basement and garage floor concrete to be poured this week.

Floor

 Front and back walls up.




Interior walls up. Living room looking towards kitchen and breezeway.

 Kitchen looking into office.

Kitchen looking towards eating area and living room.

Breezeway and garage up.




First floor framing still


Living room. Cathedral ceiling.


 Living room looking towards fireplace.

Living room looking towards front foyer.

Standing in foyer looking down hallway to back of house towards eating area.

Interior of garage. Rear door is 10' tall, 12' wide.  Dually should slide in there no problem!





Second floor.

 There will be an overlook from the upstairs hallway into the living room.



 Tom Fredo pouring cement into the porch piers that will support the wrap around porch.






Gate installed this weekend. Keep out the riff raff.

 Thank you for checking out our home. More to come as the week progresses!